4. CL Guide Rail Removal
Remove the screws, then remove the CL guide
rail.
5. Pinch Pressure Assembly Removal
(1) Disconnect the two harnesses from the
connectors CN851 and CN854 on the PD-35
board.
(2) Remove the two screws, then remove the
pinch pressure assembly.
DNW-A100/A50/A45
DNW-A100P/A50P/A45P
5-20. Threading Ring and Ring Roller Replacement
Screw (B3 x 8)
CL Guide Rail Removal
Screw (PSW3 x 8)
Harness
Screw (PSW3 x 8)
Harness
PD-35 board
CN854
CN851
Pinch pressure
assembly
Pinch Pressure Assembly Removal
Screw (B3 x 8)
CL guide rail
5-135