9. Attach the Pinch Press Assembly
Align the notch of the pinch press assembly with
the center of the two pins and tighten the two
screws.
Tightening torque: 98 x 10
_2
{10.0 kgf . cm}
10. Connect the Harneeses
Connect the harnesses to CN851 and CN854 on
the PD-35 board.
Adjustment after Replacement
11. Confirm the Pinch Solenoid Operation
Refer to Section 4-2-2 in Maintenance Manual
Part 1.
(C020: PINCH ROLLER)
12. Adjust the Pinch Press Clearance
Refer to Section 5-12-2.
DNW-A100/A50/A45
DNW-A100P/A50P/A45P
N.m
PD-35 board
5-12-1. Replacement Procedure of the Pinch Solenoid
Screw (PSW3 x 8)
Harness
Screw (PSW3 x 8)
Harness
CN854
CN851
Pinch press
assembly
Notch
TC-96 board
• Pinch press assembly positioning
Notch
Pins
Pinch press assembly
Attach the Pinch Press Assembly
Pins
Center of two pins
5-83