Siemens SINAMICS G120 Operating Instructions Manual page 80

Low voltage inverters built-in units with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Installing
4.4 Connecting the line supply and motor
Additional requirements placed on the protective conductor
● For permanent connection, the protective conductor must fulfill at least one of the following
conditions:
– The protective conductor is routed so that it is protected against damage along its
– As a conductor of a multi-conductor cable, the protective conductor has a cross-section
– For an individual conductor, the protective conductor has a cross-section ≥ 10 mm² Cu.
– The protective conductor consists of two individual conductors with the same cross-
● When connecting a multi-core cable using an industrial plug connector according to EN
60309, the protective conductor must have a cross-section of ≥ 2.5 mm² Cu.
78
complete length.
Cables routed inside switch cabinets or enclosed machine housings are considered to
be adequately protected against mechanical damage.
≥ 2.5 mm² Cu.
section.
Converter with the CU250S-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E31759476B AG
:

Advertisement

Table of Contents
loading

Table of Contents