Siemens SINAMICS G120 Operating Instructions Manual page 286

Low voltage inverters built-in units with cu250s-2 control units and encoder evaluation
Hide thumbs Also See for SINAMICS G120:
Table of Contents

Advertisement

Advanced commissioning
6.20 PID technology controller
The inverter uses the start value when all the following conditions are simultaneously satisfied:
● The technology controller supplies the main setpoint (p2251 = 0).
● The ramp-function generator output of the technology controller has not yet reached the start value.
Figure 6-45
Simplified representation of the technology controller
Basic settings
The settings required as a minimum are marked in gray in the function diagram:
● Interconnect setpoint and actual values with signals of your choice
● Set ramp-function generator and controller parameters K
284
, T
P
Converter with the CU250S-2 Control Units
Operating Instructions, 04/2018, FW V4.7 SP10, A5E31759476B AG
and T
.
I
d

Advertisement

Table of Contents
loading

Table of Contents