Purge Air Switching - Siemens SIPART PS2 Operating Instructions Manual

Electropneumatic positioners with profibus pa
Hide thumbs Also See for SIPART PS2:
Table of Contents

Advertisement

Commissioning

7.4 Purge air switching

7.4
Purge air switching
When the enclosure is open, the purge air switch above the pneumatic terminal strip on the
pneumatic block can be accessed.
● In the IN position, the enclosure is flushed from inside with a small volume of clean and dry
● In the OUT position, the purge air is directly directed towards outside.
The factory setting is the "IN" position.
122
instrument air.
Purging air selector
Pneumatic connections Y1, PZ and Y2
Figure 7-1
Purge air switch on the pneumatic block; view of the positioner on the pneumatic
connection side when the cover is open
SIPART PS2 with PROFIBUS PA
Operating Instructions, 02/2016, A5E00127926-AB

Advertisement

Table of Contents
loading

Table of Contents