Remove the right rear engine hanger bolt.
Remove the three bolts and right sub-frame.
• A hoist or equivalent is required to support the
motorcycle when removing the engine.
Remove the joint boot from the engine side.
Be careful not to
Move the engine forward slightly and remove the
damage the wire
output shaft from the universal joint.
harnesses, hoses,
Lower the engine and move it out of the frame.
and cables during
engine removal.
ENGINE INSTALLATION
• Before installing the engine, route the wires,
hoses, and cables properly (page 1-23).
• When tightening the lock nut with the lock nut
wrench, refer to torque wrench reading informa-
tion on page 7-3 "SERVICE INFORMATION."
• A hoist or equivalent is required to support the
motorcycle when installing the engine.
• Be sure to use the engine hanger adjusting bolts,
adjusting bolt lock nuts, hanger bolts and hanger
nuts in their correct positions.
Install the engine hanger adjusting bolts into the left
side mounting points from the inside, and screw
them in fully.
ENGINE REMOVAL/INSTALLATION
JOINT BOOT
O TP T SHAFT
NIVERSAL JOINT
ENTER: 20 mm BOLT
FRONT: 22 mm BOLT
REAR: 22 mm BOLT
ANGER BOLT
7-11