IBM pSeries 630 6C4 Service Manual page 132

Hide thumbs Also See for pSeries 630 6C4:
Table of Contents

Advertisement

Step 1521-11
Does the system contain two power supplies?
NO
Go to "Step 1521-12".
YES
Go to "Step 1521-14" on page 113.
Step 1521-12
Shut down the system and remove all power cables from the rear of the system unit.
Exchange the following FRUs in the order listed:
1. Power supply
2. CEC backplane
3. PCI riser card
Restart the system and perform error log analysis.
Do you get an SRN indicating a voltage sensor is out of range?
The last FRU exchanged is defective. Go to "MAP 0410: Repair Checkout" in the RS/6000
NO
Eserver pSeries Diagnostic Information for Multiple Bus Systems.
YES
Reinstall the original FRU.
Repeat the FRU replacement steps until a defective FRU is identified or all the FRUs have been
exchanged.
If the symptom did not change and all FRUs have been exchanged, go to "Step 1521-13".
If the symptom changed, check for loose cards, cables, and obvious problems. If you do not find a
problem, go to the "Quick Entry MAP" on page 63 and follow the instructions for the new symptom.
Step 1521-13
Check that the wall outlet is properly wired and is providing the correct voltage.
Did you find a problem?
NO
Go to "MAP 1548: Processor Subsystem Problem Isolation" on page 139.
Correct the problem. Go to "MAP 0410: Repair Checkout" in the RS/6000 Eserver pSeries
YES
Diagnostic Information for Multiple Bus Systems.
112
Eserver pSeries 630 Model 6C4 and Model 6E4 Service Guide

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pseries 630 6e4

Table of Contents