Download Print this page
IBM eServer pSeries 630-6C4 Quick Setup Instructions Manual
IBM eServer pSeries 630-6C4 Quick Setup Instructions Manual

IBM eServer pSeries 630-6C4 Quick Setup Instructions Manual

Hide thumbs Also See for eServer pSeries 630-6C4:

Advertisement

Quick Links

Read Me First
Read Me First
Quick Setup Instructions
pSeries 630-6C4
The following system manuals are packaged in Box 2:
System Unit Safety Information
Site and Hardware Planning Guide
Adapters, Devices, and Cabling Information for Multiple Bus Systems
Read and understand the caution notices found in this booklet. For a
complete listing of all safety notices and other documentation related
to this product, visit the IBM
http://publib16.boulder.ibm.com/pseries/index.htm.
To access the pSeries publications, click Hardware documentation.
If you encounter difficulties while setting
up your system, contact your service
representative for assistance.
pSeries and AIX Information Center
You must provide the following items:
One flat-blade screwdriver
One 5mm nut driver (optional)
One 5.5mm nut driver (optional)

Advertisement

loading

Summary of Contents for IBM eServer pSeries 630-6C4

  • Page 1 Adapters, Devices, and Cabling Information for Multiple Bus Systems Read and understand the caution notices found in this booklet. For a complete listing of all safety notices and other documentation related to this product, visit the IBM pSeries and AIX Information Center http://publib16.boulder.ibm.com/pseries/index.htm.
  • Page 2: Check Your Inventory

    The alignment-pin bracket kit Cable-Management Arm Kit contains: might be needed when installing 1- Cable-Management Arm your system in a non- IBM style 1- Rack to Cable Management Arm Bracket rack. If you are installing your 1- Cable-Carrier Support Bracket...
  • Page 3: Check The Power Source

    Read safety notices The exclamation mark surrounded by a yellow triangle denotes caution. A CAUTION notice indicates the presence of a hazard that has the potential of causing moderate or minor personal injury. Before doing a step that contains a caution icon, read and understand the caution statement that accompanies it.
  • Page 4 Use the rack mount template Know the following about the EIA units located on the front and rear of your rack: Each EIA unit consists of three holes. The holes along the rail within each EIA unit are not evenly spaced. Each EIA unit begins at the point where the hole spacing is closest together.
  • Page 5: Install The Rails

    Never work from the top down. 3) If you are installing a Model 6C4 into a non-IBM rack, check the alignment pins located on the front and rear of your rails. If they are not the correct diameter, locate the alignment-pin bracket kit, and install the correct alignment pins and pin brackets.
  • Page 6 Install the rails (continued) Go to the rear of the rack. Attach two 7 mm screws to the left rail. Use this size 7 mm screw to complete this step. Attach a 7 mm screw through alignment the bottom-right-rail screw hole. (As viewed from the back of the rack.) Locate the cable-management arm bracket.
  • Page 7 Attach the cable-carrier support bracket Locate the cable-carrier support bracket, and position it on the rear of the system Use this size 5 mm screw as shown. to complete this step. Secure the cable-carrier support bracket with two 5 mm slotted hex head screws.
  • Page 8 Tighten the rail retaining screws 10.1 Take along your screwdriver or nut driver to the rear of the rack. 10.2 Use your screwdriver or nut driver to tighten the four rear rail retaining screws. 10.3 With your screwdriver or nut driver, return to the front of the rack.
  • Page 9: Install The Cable Management Arm

    Completing Your System Installation Quick Setup Instructions. T he quick setup instructions can be printed in hardcopy or viewed online at the information center. The IBM pSeries and AIX Information Center can be accessed http://publib16.boulder.ibm.com/pseries/index.htm. Go to Box 2.