AeroWorks 75cc YAK-54 ARF-QB Assembly Manual page 89

Table of Contents

Advertisement

17.
Slide receiver antenna under the rudder servo
tray toward the rear of the fuse.
18.
Push receiver antenna all the way into the re-
ceiver antenna tube aft of the rudder servo
tray.
Note: Apply baby powder to antenna wire to
assist getting it into the tube.
19. Attach all servos, battery, regulator, and switch
leads to the proper connectors.
A typical radio installation is shown below.
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents