AeroWorks 75cc YAK-54 ARF-QB Assembly Manual page 69

Table of Contents

Advertisement

19.
Prepare to slide the silicon tubing onto the ny-
lon tie. The split end of the tubing goes oppo-
site the nylon tie lock a shown.
20.
Slide the silicon tubing onto the nylon tie as
shown to form the pipe strap assembly.
21.
Locate the two plywood pipe mounting doub-
lers with pre-installed blind nuts as shown.
22.
Slide the pipe mounting doublers under the
rudder servo mounting tray and align the blind
nuts with the mounting holes as shown.
69

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents