AeroWorks 75cc YAK-54 ARF-QB Assembly Manual page 29

Table of Contents

Advertisement

19.
Tighten the second loop through the brass
swage tube as shown.
20.
Crimp the brass tube with a crimping tool or
pliers.
21.
Hint: If additional crimping is needed a small
C-Clamp may be used for additional crimping
pressure.
22.
Cut off excess cable as shown.
29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents