Suzuki GSX-R750 Service Manual page 50

Hide thumbs Also See for GSX-R750:
Table of Contents

Advertisement

0B-20 Maintenance and Lubrication:
Front Fork Inspection
Inspect front fork
Every 12 000 km (7 500 miles, 24 months)
Inspect the front forks for oil leakage, scoring or
scratches on the outer surface of the inner tubes.
Replace any defective parts, if necessary. Refer to
"Front Fork Disassembly and Assembly in Section 2B
(Page 2B-5)".
Rear Suspension Inspection
Inspect rear suspension
Every 12 000 km (7 500 miles, 24 months)
Inspect the rear shock absorber for oil leakage and
check that there is no play in the swingarm.
Replace any defective parts, if necessary. Refer to "Rear
Shock Absorber Removal and Installation in Section 2C
(Page 2C-3)", "Cushion Lever Removal and Installation
in Section 2C (Page 2C-6)" and "Swingarm Removal
and Installation in Section 2C (Page 2C-10)".
Chassis Bolt and Nut Inspection
B838H20206021
Tighten chassis bolt and nut
Initially at 1 000 km (600 miles, 2 months) and every
6 000 km (4 000 miles, 12 months) thereafter
Check that all chassis bolts and nuts are tightened to
their specified torque.
1
I838H1020006-01
2
3
4
B838H20206022
5
6
7
I837H1020046-01
8
9
I837H1020047-02
3
(c)
4
(c)
Steering stem lock-nut 90 N⋅m (9.0 kgf-m, 65.0 lb-ft)
Steering stem head nut 90 N⋅m (9.0 kgf-m, 65.0 lb-ft)
Front fork upper clamp bolt 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
Handlebar clamp bolt 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
5
(d)
6
Front brake master cylinder mounting bolt 10 N⋅m (1.0 kgf-m, 7.0
lb-ft)
Brake hose union bolt 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
Front master cylinder air bleeder valve 6 N⋅m (0.6 kgf-m, 4.5 lb-ft)
8
(c)
Front fork lower clamp bolt 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
Steering damper bolt/nut 23 N⋅m (2.3 kgf-m, 16.5 lb-ft)
B838H20206023
2
(b)
1
(a)
I837H1020049-01
7
(e)
(c)
I837H1020050-01
9
(c)
I837H1020051-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents