CHAPTER 4

Site Preparation

Site Preparation Checklist for an EX8200 Switch

Table 37: Site Preparation Checklist

Item or Task
Environment
Verify that environmental factors such as
temperature and humidity do not exceed switch
tolerances.
Power
Measure distance between external power
sources and switch installation site.
Copyright © 2010, Juniper Networks, Inc.
Site Preparation Checklist for an EX8200 Switch on page 85
General Site Guidelines for EX Series Switches on page 87
Site Electrical Wiring Guidelines for EX Series Switches on page 88
Environmental Requirements and Specifications for EX Series Switches on page 89
The checklist in Table 37 on page 85 summarizes the tasks you need to perform to prepare
a site for installing an EX8200 switch.
For More Information
"Environmental Requirements and
Specifications for EX Series Switches"
on page 89
Performed By
Date
85