An Open Rail-Locking Carrier At The Rear Of The - IBM SAN Volume Controller Hardware Maintenance Manual

System storage san volume controller
Table of Contents

Advertisement

Figure 57. An open rail-locking carrier at the rear of the support rail for the SAN Volume Controller 2145-8A4
2. Position the rail at the correct height in the rack.
a. Start from the front and align the pins ( 1 in Figure 58 on page 63) on the front rail-locking
carrier with the holes on the rack mounting flange 2 .
b. Release the rail-locking latch by pushing the smaller blue tab 3 away from the rail. The pins
spring into the closed position. Ensure that the pins go fully through the holes in the mounting
flange, as shown in Figure 58 on page 63.
c. At the rear of the rack, align the pins on the rear rail-locking carrier with the holes on the rack
mounting flange.
62
IBM SAN Volume Controller Hardware Maintenance Guide

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SAN Volume Controller and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

2145-cf82145-8a42145-8g42145-8f42145-8f2

Table of Contents