Section 2 - Installation; Unpacking; Installation Requirements - Radyne MM200 Installation And Operation Manual

Mm200 high speed microwave modem
Table of Contents

Advertisement

MM200 High-Speed Microwave Modem
Installation

2.0 Installation Requirements

The MM200 is designed to be installed within any standard 19-inch equipment cabinet or rack,
and requires 2 rack unit (RU) mounting spaces (3.5 inches) vertically and 19 inches of depth.
Including cabling, a minimum of 20 inches of rack depth is required. The rear panel of the MM200
is designed to have power enter from the left and IF cabling enter from the right when viewed from
the rear of the unit. Data and control cabling can enter from either side although they are closer to
the center. The unit can be placed on a table or suitable surface if required.
There are no user-serviceable parts or configuration settings located
inside the MM200 chassis. There is a potential shock hazard internally at
the power supply module. DO NOT open the MM200 chassis under any
circumstances.
Before initially applying power to the unit, it is a good idea to disconnect
the transmit output from the operating station equipment.
especially true if the current MM200 configuration settings are unknown,
where incorrect setting could disrupt existing communications traffic.
The MM200 contains a Lithium Battery. DANGER OF EXPLOSION exists if
the battery is incorrectly replaced.
equivalent type recommended by the manufacturer.
batteries in accordance with manufacturers instructions

2.1 Unpacking

The MM200 Modem was carefully packaged to avoid damage and should arrive complete with the
following items for proper installation:
MM200 Unit
Prime power connection
Installation and Operation Manual
TM086 - Rev. 4.1
Replace only with the same or
Dispose of used
Installation
2
This is
2-1

Advertisement

Table of Contents
loading

Table of Contents