Fluke 9100 User Handbook Manual page 81

Universal calibration system
Hide thumbs Also See for 9100:
Table of Contents

Advertisement

6.C.6
Operation Complete
This command conforms to the IEEE 488.2 standard requirements.
OPC
is a synchronization command which will generate an operation
complete message in the standard Event Status Register when
all pending operations are complete.
6.C.7
Operation Complete?
This query conforms to the IEEE 488.2 standard requirements.
Response Decode:
The value returned is always 1, which is placed in the output
queue when all pending operations are complete.
Appendix C to Section 6: 9100 System Operation — IEEE 488.2 Common Commands and Queries
OPC
Execution Errors:
None.
Power On and Reset Conditions
Not applicable.
OPC?
Final Width = 215mm
6-C5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents