Download Print this page

Confirmation Panels; Confirm Execution Dissolve Panel - HP XP P9500 Reference Manual

Hp p9000 for business continuity manager software reference guide
Hide thumbs Also See for XP P9500:

Advertisement

Table 85 Contents of the Logical Path Status of Copy Group Pair Panel
Copy Group ID
Type
Primary
Secondary
Primary
Dir
Secondary
Status

Confirmation Panels

This section explains panels that are displayed to check the execution of each operation.

Confirm Execution Dissolve Panel

If d is specified in AC in the Manage Copy Groups panel, the Confirm Execution Dissolve panel
is displayed, prompting you to confirm whether the copy pair is dissolved.
Figure 131 (page 170)
Item
S/N
PathID
CU
SSID
S/N
PathID
CU
SSID
shows the Confirm Execution Dissolve panel.
Description
Copy group ID
Path type
CU: Inter-control unit logical path
DKC: Inter-disk controller logical path
Primary storage system serial number
Primary path ID
When the path type is CU, nothing is displayed.
Primary control unit number
Primary SSID
Secondary storage system serial number
Secondary path ID
When the path type is CU, nothing is displayed.
Secondary control unit number
Secondary SSID
Primary port number
Path direction
Secondary port number
Status of each physical path
ESTABLISHED: The physical path has been established.
INIT FAILED: Initialization failed.
NO RESOURCES AT PRI: The port for the primary storage system
is invalid.
NO RESOURCES AT SEC: The port for the secondary storage
system is invalid.
SERIAL# MISMATCH: The storage system serial numbers do not
match.
CONFIG ERROR: The interface ID is invalid.
Confirmation Panels 169

Advertisement

loading

This manual is also suitable for:

P9000 for business continuity manager 6.6.1