3Com 3C63400-3AC-C - PathBuilder S700 Switch Reference Manual page 57

Wan access switch
Table of Contents

Advertisement

Once you have connected the QSIM, verify the front panel indicators. As shown in
Figure 18, in addition to the common system front panel indicators, each port has
a pair of LEDs to the left of the port.
ENBL—Illuminates when the port is in service.
CLK—Illuminates when clocking is in service.
Figure 18 QSIM LEDs
Slot 1
Step 4: Connect I/O Cabling and Wiring
Slot 18
CLK
43
Power On
Inservice
Fail
Test
ENBL
PORT 4
PORT 3
60-Pin
Amphenol
Connectors
PORT 2
PORT 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3C63400-3AC-C - PathBuilder S700 Switch and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Pathbuilder s700

Table of Contents