Routing The Cables - Cisco IPS-4240-K9 - Intrusion Protection Sys 4240 Installation Manual

Intrusion prevention system appliances and modules 5.0
Hide thumbs Also See for IPS-4240-K9 - Intrusion Protection Sys 4240:
Table of Contents

Advertisement

Chapter 4
Installing IDS-4235 and IDS-4250
Figure 4-10

Routing the Cables

To route the cables, follow these steps:
Attach the I/O cable connectors to their respective connectors on the appliance back panel.
Step 1
For details on the cable connections, see
Step 2
Route the power and I/O cables through the cable-management arm, using four loosely secured
releaseable tie-wraps (two in the middle and on each end of the cable-management arm).
Note
78-16124-01
Power Cord Strain Relief
Do not fully tighten the tie-wraps at this time (see
slack in the cable-management arm to prevent damage to the cables.
Installing Cisco Intrusion Prevention System Appliances and Modules 5.0
Installing IDS-4235 and IDS-4250, page
Figure 4-11 on page
Installing the Accessories
4-7.
4-26). Allow some cable
4-25