Installing Center Mount Brackets - Cisco IPS-4240-K9 - Intrusion Protection Sys 4240 Installation Manual

Intrusion prevention system appliances and modules 5.0
Hide thumbs Also See for IPS-4240-K9 - Intrusion Protection Sys 4240:
Table of Contents

Advertisement

Installing the Accessories

Installing Center Mount Brackets

You need the following tools and supplies to install the brackets in a two-post, open-frame relay rack:
To install the center mount brackets in a two-post, open-frame relay rack, follow these steps:
Step 1
Determine where you want to place IDS-4210.
Step 2
Mark the upper and lower mounting positions on the two posts.
Step 3
Locate one of the two brackets and align it over the two threaded holes on the side of IDS-4210
(Figure
Figure 2-3
Phillips screws
Secure the bracket to IDS-4210 chassis using two screws
Step 4
Repeat Step 4 to install the remaining bracket on the other side of IDS-4210.
Step 5
Step 6
Lift IDS-4210 into position between the two posts with the hole in the mounting bracket aligned one hole
above the mark you made in the two posts
Installing Cisco Intrusion Prevention System Appliances and Modules 5.0
2-8
#2 Phillips screwdriver
Masking tape or felt-tip pen to mark the mounting holes to be used
2-3).
Installing Center Mount Brackets
Pan-head
LINK
100M bps
LINK 100M
bps
DRIV E 0
DRIV E 1
CON S
ETH ERN ET
0 ETH ERN
ET 1
SCS I LVD ONLY
DRIV E 0
DRIV E 1
(Figure
(Figure
2-3).
Chapter 2
Installing IDS-4210
Pan-head
Phillips screws
(2 per bracket)
2-3).
78-16124-01

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents