7.8 Follow-up Procedure

Seal the cable holes with sealing putty and ensure that there is no gap between
cables.
The forklift positioning plates are used to limit the positions of the forklift tynes
and prevent scratches on the ESS. The positioning plates can experience
deformation and paint damage due to collision, and are removed after the ESS is
installed.
Step 1 Install the RCM cover.
Figure 7-11 Installing the RCM cover
Step 2 After cables are installed, seal the PCS cable holes using the delivered sealing
putty.
Issue 01 (2024-07-31)
CA UTION
Copyright © Huawei Digital Power Technologies Co., Ltd.
7 Installing Cables
98

Advertisement

loading
Need help?

Need help?

Do you have a question about the Smart String ESS LUNA2000-215-2S10 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Smart string ess luna2000-215-2s12
Save PDF