Huawei LUNA2000 Series User Manual
Huawei LUNA2000 Series User Manual

Huawei LUNA2000 Series User Manual

Commercial and industrial on-grid energy storage solution
Hide thumbs Also See for LUNA2000 Series:

Advertisement

Quick Links

LUNA2000-(107-215) Series Commercial and
Industrial On-Grid Energy Storage Solution
User Manual
Issue
04
Date
2025-02-08
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LUNA2000 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei LUNA2000 Series

  • Page 1 LUNA2000-(107-215) Series Commercial and Industrial On-Grid Energy Storage Solution User Manual Issue Date 2025-02-08 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 4: Change History

    Issue 02 (2024-09-30) Updated 6.3 Commissioning Using the Deployment Wizard. Added section 5.4 "Checking the Phase Sequence". Issue 01 (2024-08-12) This issue is used for first office application (FOA). Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    7 System Commissioning (App).................... 39 8 System Power-Off......................... 40 A Meter Cable Connection and Parameter Settings............41 B Reference Documents......................48 C Digital Power Customer Service..................50 D Contact Information......................51 Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 LUNA2000-(107-215) Series Commercial and Industrial On-Grid Energy Storage Solution User Manual Contents E Acronyms and Abbreviations....................53 Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7: Solution Introduction

    Figure 1-1 shows the networking architecture of the ESS-only system. Table 1-1 lists the components. Figure 1-1 Networking architecture of the ESS-only system Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8 Meter at the grid DTSU666-HW or Purchased from the Company connection point YDS60-80 (optional) FusionSolar Smart SmartPVMS 24.6.0 Purchased from the Company PV Management and later System (SmartPVMS) Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9: Pv+Ess

    The PV+ESS system is mainly used for maximum PV self-consumption as well as peak staggering and peak shaving at the grid connection point. Figure 1-2 shows the networking architecture of the PV+ESS system. Table 1-2 lists the components. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 Table 1-2 Components of the PV+ESS system Name Model/ Quan Remarks Specifications tity Smart String ● LUNA2000-215 ≤ 20 Purchased from the Company Energy Storage -2S10 System (ESS) ● LUNA2000-161 -2S11 ● LUNA2000-107 -1S11 Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11 ● SUN2000-60KT L-M0 ● SUN2000-75KT L-M1 ● SUN2000-100K TL-M1 ● SUN2000-100K TL-M2 ● SUN2000-110K TL-M2 ● SUN2000-115K TL-M2 ● SUN2000-150K -MG0-ZH ● SUN2000-150K -MG0 ● SUN5000-150K -MG0-ZH ● SUN5000-150K -MG0 Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12 Meter at the grid DTSU666-HW or Purchased from the Company connection point YDS60-80 (optional) FusionSolar Smart SmartPVMS 24.6.0 Purchased from the Company PV Management and later System (SmartPVMS) Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13: Communication Logic

    ● RS485: 1000 m ● FE: 100 m Select any of the following topologies based on the quantities of ESSs in the array and the deployment of optical fibers. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 If the ESS FE ring topology is implemented through the SmartModule, the ESS must be connected to the GE2 and GE3 ports of the SmartModule. Otherwise, the SmartLogger cannot communicate with the ESS properly. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 One SmartLogger can connect to a maximum of 20 ESSs. ● If more than 20 ESSs are connected, multiple SmartLoggers are required. These SmartLoggers are controlled by a third-party controller. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16: Technical Specifications

    5 m, respectively. ESS health diagnosis Supported This feature needs to be used on the FusionSolar SmartPVMS. SmartDesign Supported ESS safety black box Supported Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 Phase-level Supported This feature can be power limit enabled only in export control limitation mode. This feature can be used together with maximum self- consumption/TOU and capacity control. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18: M Methods

    ESS or an parameters of Manual inverter to locally manage a single device the ESS or the inverter. locally ● Upgrading the software version of a single device locally Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19: Installation And Cable Connection

    Ensure that the phase sequence of the AC power cables of the ESS is consistent with that of the isolation transformer and power grid. Otherwise, the system may fail to run properly. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20 Step Task Precaution Installing For details about the cable connections, see communications Communication Logic. cables Installing the inverter and SUN2000P Installing the power meter Installing the SACU or SmartLogger Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21: Check And Preparation Before Power-On

    3885 High Concentration of Combustible Gas – 3886 Combustible Gas Detector Communication Failed – 3887 Combustible Gas Detector Faulty – 3888 Temperature and Humidity Sensor Communication Failed – 3889 Temperature and Humidity Sensor Faulty Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 LUNA2000-(107-215) Series Commercial and Industrial On-Grid Energy Storage Solution User Manual 4 Check and Preparation Before Power-On – 3893 Fire Alarm – 3931 Fire Suppression System Alarm ----End Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23: System Power-On

    During the power-on procedure, monitor the system for faults. If you detect any faults, power off the ESS, rectify the faults, and then continue with the procedure. 5.1 On-Grid ESS-Only System Figure 5-1 Power-on process of the on-grid ESS-only system Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24: On-Grid Pv+Ess System

    Note: For details about the switch layout and operations of the devices prepared by the customer, see the documents provided by the vendors. 5.2 On-Grid PV+ESS System Figure 5-2 Power-on process of the on-grid PV+ESS system Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25 3. Check that other indicators are not steady red. Note: For details about the switch layout and operations of the devices prepared by the customer, see the documents provided by the vendors. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26: System Commissioning (Web)

    Method 2: Choose Monitoring > ESS > Running Param. > Basic Parameters, and set Startup authorization code. Step 2 Click Maintenance, choose Device Mgmt. > Connect Device, and check that the devices are connected. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27: Commissioning Using The Deployment Wizard

    6.3 Commissioning Using the Deployment Wizard Step 1 Set basic parameters. Figure 6-2 Setting basic parameters Step 2 Connect to devices. Click Search for Device to check the cable connections and allocate addresses. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28 Set the inverter grid code of the country or region where the devices are used. Working mode Set this parameter to PQ. Microgrid compatibility Set this parameter to Disable. Set battery parameters. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 Figure 6-5 Battery settings Parameter Description Working mode Set this parameter to maximum self-consumption, TOU, charge/discharge based on grid dispatch, or TOU (fixed power). For details, see 6.4.1 Working Mode. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30 Set this parameter as required. This parameter indicates the end-of-discharge SOC for the battery pack with the lowest SOC of an ESS in the array. Step 6 Connect to a Huawei network management system (NMS). Set related parameters by referring to "Setting Parameters for Connecting to the Management System"...
  • Page 31 ESS in the scenario with multiple ESSs. Wire sequence detection is required only in the zero feed-in scenario with phase-level power control for three-phase imbalance. Click Starting up to detect the wire sequence. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32 Select Three-phase three-wire. ● For the ESS: Choose Monitoring > ESS > Running Param. > Grid Parameters, and set Output mode for the ESS based on the earthing system. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33: Battery Commissioning

    The SmartLogger directly delivers the external scheduling power limit. No other power scheduling control is performed. The power is automatically controlled by the device. The no control mode is used only for commissioning. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34 Example of maximum self-consumption (ESS capacity: 800 kWh/400 kW) Figure 6-10 Example of maximum self-consumption Table 6-1 Running parameters for maximum self-consumption Parameter Description Working mode Set this parameter to Maximum self-consumption. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35 In some countries, the grid is not allowed to charge the ESS. In this case, this mode cannot be used. ● Example of TOU (ESS capacity: 800 kWh/400 kW; Preferred use of surplus PV power is set to Charge) Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36 Industrial On-Grid Energy Storage Solution User Manual 6 System Commissioning (Web) Figure 6-11 Example of TOU Table 6-2 Running parameters for TOU Parameter Description Working mode Set this parameter to TOU. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37 Mon. through Sun. in the Repeat box. The buttons are blue by Charge/Discharge default, indicating being selected. After you click it, the button turns gray. Repeat Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38 ● PV energy supply priority: load > ESS > power grid > power grid > ESS ● Load power consumption ● Load power consumption priority: PV > power grid priority: PV > power grid Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39 Smart PCS limits the power, the grid charges the ESS with the maximum capability. If the ESS is not fully charged when the scheduling target value is met, the PV energy is used to charge the ESS. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40: Scheduling Mode

    Procedure Choose Settings > Battery Control > Battery Control and set parameters related to the scheduling mode for battery control. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Capacity Control

    The Peak shaving function allows you to lower the peak demand purchased from the grid during peak hours, reducing electricity fees. Peak shaving applies to areas where demand charges are collected. The peak Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42 Specifies the backup power SOC for capacity control. for capacity control The value of this parameter affects the peak shaving capability. A larger value indicates stronger peak shaving capability. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43: Multi-Mode Overlay

    Step 1 Choose Settings > Battery Settings > Battery Settings and set Working mode to TOU. Step 2 Set Preferred use of surplus PV power to Charge. For details about how to set other parameters, see TOU. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44 Step 2 Set Preferred use of surplus PV power to Fed to grid. For details about how to set other parameters, see TOU. Step 3 Choose Settings > Battery Settings > Capacity Control and set the parameters by referring to 6.4.3 Capacity Control. ----End Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45: System Commissioning (App)

    Industrial On-Grid Energy Storage Solution User Manual 7 System Commissioning (App) System Commissioning (App) For details about how to commission the system (app), see FusionSolar App Quick Guide (SmartLogger). Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46: System Power-Off

    Wear insulated gloves and use insulated tools to prevent electric shocks or short circuits. NO TE To prevent local operations on switches during subsequent power-on, you are advised not to turn off the auxiliary power switches. ----End Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47: A Meter Cable Connection And Parameter Settings

    Meter Cable Connection Position The meter at the grid connection point must be connected to the metering point where the customer purchases electricity. Figure A-1 Example of the correct cable connection position Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 48 Meter access direction to Positive. When the meter is connected correctly, the power flows from the grid to the load. For details about correct meter connection, see Figure A-3 Figure A-4. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49 LUNA2000-(107-215) Series Commercial and Industrial On-Grid Energy Storage Solution User Manual A Meter Cable Connection and Parameter Settings Figure A-3 Example 1 of correct meter connection Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50 Figure A-4 Example 2 of correct meter connection Meter Parameter Settings Step 1 Connect to the meter. Choose Deployment Wizard > Power Meter. After setting meter access parameters, click Add Devices. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51 Set running parameters for the meter. Parameter Description Device Meter Intelligent Power – If the power meter model is DTSU666-HW, select Meter Type DTSU666-HW. – If the power meter model is YDS60-80, select YADA-YDS60-80. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52 Cables must be connected to the meter in correct polarities. If the cables are reversely connected, power off the meter, rectify the physical cable connection, and then set Meter access direction to Positive. Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53 Control uses Power factor closed-loop control. Choose Settings > Power Adjustment > Reactive Power Control. Set Reactive power control mode to Power factor closed-loop control. Set Electric meter power direction to Positive. ----End Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54: Reference Documents

    M2) Quick Guide (Amphenol) ● SUN2000-(50K, 75K, 80K, 150K)-MG Series User Manual ● SUN2000-(50K, 75K, 80K, 150K)-MG Series Quick Guide ● SUN5000-(150K-MG0-ZH,150K-MG0) User Manual ● SUN5000-(150K-MG0-ZH, 150K-MG0) Quick Guide Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55 DTSU666-HW Smart Power Sensor Quick Guide ● YDS60-80 Smart Power Sensor Quick Guide FusionSolar FusionSolar App User Manual SmartPVMS ● SmartPVMS FusionSolar SmartPVMS User Manual (Owner) ● SmartPVMS FusionSolar SmartPVMS User Manual (Installer) Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56: C Digital Power Customer Service

    LUNA2000-(107-215) Series Commercial and Industrial On-Grid Energy Storage Solution User Manual C Digital Power Customer Service Digital Power Customer Service https://digitalpower.huawei.com/robotchat/ Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57: Contact Information

    To ensure faster and better services, we kindly request your assistance in providing the following information: ● Model ● Serial number (SN) ● Software version ● Alarm ID or name ● Brief description of the fault symptom Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58 Industrial On-Grid Energy Storage Solution User Manual D Contact Information NO TE EU Representative Information: Huawei Technologies Hungary Kft. Add.: HU-1133 Budapest, Váci út 116-118., 1. Building, 6. floor. Email: hungary.reception@huawei.com Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Acronyms And Abbreviations

    Industrial On-Grid Energy Storage Solution User Manual E Acronyms and Abbreviations Acronyms and Abbreviations energy storage system fast Ethernet SACU Smart Array Controller state of charge state of health uninterruptible power supply Issue 04 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.