Huawei LUNA2000-215-2S10 User Manual
Huawei LUNA2000-215-2S10 User Manual

Huawei LUNA2000-215-2S10 User Manual

Commercial and industrial microgrid energy storage solutio
Hide thumbs Also See for LUNA2000-215-2S10:

Advertisement

Quick Links

LUNA2000-215-2S10 Commercial and Industrial
Microgrid Energy Storage Solution
User Manual
Issue
02
Date
2025-02-08
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the LUNA2000-215-2S10 and is the answer not in the manual?

Questions and answers

Summary of Contents for Huawei LUNA2000-215-2S10

  • Page 1 LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual Issue Date 2025-02-08 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 Notice The purchased products, services and features are stipulated by the contract made between Huawei Digital Power Technologies Co., Ltd. and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
  • Page 3: About This Document

    Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 4: Change History

    Updated 3 Installation and Cable Connection. Updated 6.3 Commissioning Using the Deployment Wizard. Updated 8 Microgrid Control. Issue 01 (2025-01-23) This issue is used for first office application (FOA). Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 5: Table Of Contents

    7 System Commissioning (App).................... 52 8 Microgrid Control........................53 8.1 On-grid/Off-grid (PQ/VSG)............................... 53 8.2 On-grid/Off-grid (VSG)...............................59 8.3 Off-grid..................................... 68 9 System Operations........................ 73 10 System Power-Off....................... 78 A Off-Grid UPS Capacity Configuration................79 Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 6 LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual Contents B Reference Documents......................80 C Digital Power Customer Service..................83 D Contact Information......................84 E Acronyms and Abbreviations....................86 Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 7: Solution Introduction

    In this system, the microgrid implements on-grid and off-grid operations through an on/off-grid switch. When the system is off-grid, the ESS functions as the main Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 8 Table 1-1 Components of the on/off-grid PV+ESS (PQ/VSG) system Name Model/Specifications Quantity Remarks Smart String ● LUNA2000-215-2S10 ≤ 20 Purchased from Energy the Company Storage Different models System (ESS) shall not be used together. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 9 SUN2000P is ● MERC-1100W-P supported only SUN2000-29.9KT L-M3, SUN2000-30KTL- SUN2000-36KTL- M3, and SUN2000-40KTL- MERC-1300W-P MERC-1100W-P is supported by SUN2000-50KTL- M3 and SUN2000-50KTL- ZHM3. SmartLogger SmartLogger3000 Purchased from the Company. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 10 SmartLogger. Meter at the ● DTSU666-HW Purchased from grid the Company ● YDS60-80 connection point FusionSolar SmartPVMS 24.8.0 and later Purchased from Smart PV the Company Management System (SmartPVMS) Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 11 UPS power supply shall shall be greater be provided from either than 48 hours. side of the on/off-grid switch, whichever side is available. The UPS power supply is controlled by the relay. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 12: On/Off-Grid Pv+Ess (Vsg) System

    Table 1-2 Components of the on/off-grid PV+ESS (VSG) system Name Model/ Remarks Specifications ntit Smart String ● LUNA2000-215-2 ≤ 20 Purchased from the Company Energy Storage Different models shall not be System (ESS) used together. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 13 ● SUN2000-50KTL- other vendors. ● SUN2000-60KTL- ● SUN2000-75KTL- ● SUN2000-100KTL ● SUN2000-100KTL ● SUN2000-110KTL ● SUN2000-115KTL ● SUN2000-150K- MG0-ZH ● SUN2000-150K- ● SUN5000-150K- MG0-ZH ● SUN5000-150K- Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 14 Purchased from the Company Smart PV and later Management System (SmartPVMS) Relay protection ● Schneider: Prepared by the customer device Easergy P3U30-5AAA3BB ● Two groups of potential transformers (PTs) are required. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 15 Prepared by the customer transformer and its power distribution switches > 1.2 x MAX [(Total ESS rated capacity + Total rated load peak), (Total ESS rated power + Total inverter rated capacity)] Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 16: Off-Grid Pv+Ess System

    Table 1-3 Components of the off-grid PV+ESS system Name Model/Specifications Remarks ntit Smart String ● LUNA2000-215-2S10 ≤ 20 Purchased from the Energy Storage Company Different System (ESS) models shall not be used together. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 17 Purchased from the endi Company (optional). The SmartModule is used with the SmartLogger. actu king arch itect FusionSolar Smart SmartPVMS 24.8.0 and Purchased from the PV Management later Company System (SmartPVMS) Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 18: Communication Logic

    If the ESS FE ring topology is implemented through the SmartModule, the ESS must be connected to the GE2 and GE3 ports of the SmartModule. Otherwise, the SmartLogger cannot communicate with the ESS properly. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 19 One SmartLogger can connect to a maximum of 20 ESSs. ● If more than 20 ESSs are connected, multiple SmartLoggers are required. These SmartLoggers are controlled by a third-party controller. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 20: Technical Specifications

    5 m, respectively. ESS health diagnosis Supported This feature needs to be used on the FusionSolar SmartPVMS. SmartDesign Supported ESS safety black box Supported Off-grid operation Supported Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 21 Only Maximum TOU (fixed Supported self-consumption power) and TOU are supported, and only one of them can be selected. ● TOU (fixed power) applies only to ESS- only systems. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 22 ● This feature is supported only in the on/off-grid (PQ/ VSG) scenario. It can be used together with maximum self- consumption, TOU, and capacity control. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 23 (2/3) x (1/3) x Pn ● Load of each phase ≤ (2/3) x Single- phase rated capacity, that is, Load of each phase ≤ (2/3) x (1/3) x Pn Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 24 – B: other common load capacity Capacity of ≤ 1/2 transformer switch-on/off Note a: The off-grid scenario does not involve the on-grid scheduling feature and on/off-grid switching. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 25: M Methods

    ESS or an inverter to locally parameters of a single App User manage the ESS or the inverter. device locally Manual ● Upgrading the software version of a single device locally Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 26: Installation And Cable Connection

    (height difference ≤ 3 mm). For details about the site selection requirements, see LUNA2000-(107-215) Series Smart String ESS User Manual. Installing the inverter and SUN2000P Installing the power meter Installing the SmartLogger Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 27 That is, the on/off-grid switch is linked with the internal grounding switch. Figure 3-1 is only a simplified electrical diagram. For details, see the actual electrical diagram of the power distribution cabinet. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 28 After the on/off-grid switch is turned on, the internal neutral wire grounding switch is turned off. That is, the on/off-grid switch is linked with the internal grounding switch. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 29 The two power supplies are automatically switched to ensure the power supply of the UPS in on-grid and off-grid operations. ● The PV and ESS general power ports are connected to the mains, including the neutral wires. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 30 The SmartLogger DO1 and DO2 control the load switch to switch on and off to reduce and restore loads. ● The PV and ESS general power ports are connected to the mains, including the neutral wires. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 31: Check And Preparation Before Power-On

    Step 3 Check the switch status: Ensure that the switch between the ESS AC side and the power distribution equipment is turned off, and the switch between the inverter AC side and the power distribution equipment is turned off. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 32 3886 Combustible Gas Detector Communication Failed – 3887 Combustible Gas Detector Faulty – 3888 Temperature and Humidity Sensor Communication Failed – 3889 Temperature and Humidity Sensor Faulty – 3893 Fire Alarm ----End Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 33: Device Power-On

    During the power-on procedure, power off the batteries immediately if any fault is detected. Rectify the fault before proceeding with the procedure. 5.1 On/Off-Grid PV+ESS (PQ/VSG) System Power on the on/off-grid PV+ESS (PQ/VSG) system when an external power supply is available. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 34 Turn on the power switch (if any) between the SmartLogger and the UPS based on site requirements. Powering on the For details, see Power-On Operations. UPS-ESS auxiliary power supply (for black start) Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 35: On/Off-Grid Pv+Ess (Vsg) System

    5.2 On/Off-Grid PV+ESS (VSG) System Power on the on/off-grid PV+ESS (VSG) system when an external power supply is available. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 36 UPS-relay protection device on the UPS side. protection device auxiliary power supply Powering on the For details, see Power-On Operations. UPS-ESS auxiliary power supply (for RCM and other devices) Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 37: Off-Grid Pv+Ess System

    5.3 Off-Grid PV+ESS System Power on the off-grid PV+ESS system when the UPS can supply power, the genset is not running, and the power distribution equipment has no power supply. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 38 For details, see Power-On Operations. UPS-ESS auxiliary power supply (for black start) Powering on the ESS auxiliary power supply (for LTMS and other devices) Powering on the ESS AC side Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 39 3. Check that other indicators are not steady red. Note: For details about the switch layout and operations of the devices prepared by the customer, see the documents provided by the vendors. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 40: System Commissioning (Web)

    Method 2: Choose Monitoring > ESS > Running Param. > Basic Parameters, and set Startup authorization code. Step 2 Click Maintenance, choose Device Mgmt. > Connect Device, and check that the devices are connected. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 41: Commissioning Using The Deployment Wizard

    Software Upgrade. Step 4 Clear alarms. ----End 6.3 Commissioning Using the Deployment Wizard Step 1 Set basic parameters. Figure 6-2 Setting basic parameters Step 2 Connect to devices. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 42 The system supports bidirectional switching between the two modes. The grid supply is required in this scenario. Set inverter parameters. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 43 Set this parameter to Disable. mode For license loading, click Skip. Step 3 (Optional) Connect to power meters. Set related parameters by referring to "Setting Meter Parameters" in the SmartLogger3000 User Manual . Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 44 400:5, and the PT ratio is 10000:100. ▪ Set Voltage change ratio of the power meter to 100. ▪ Set Current change ratio of the power meter to 80. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 45 Figure 6-4 Connecting to power meters Step 4 (Optional) Connect to environment monitoring instruments (EMIs). Figure 6-5 Connecting to EMIs Step 5 Set parameters for battery settings. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 46 10%, it will be extended to 10%. ● On-grid scenario: Automatic charge calibration is allowed for battery racks. ● Off-grid scenario: Automatic discharge calibration is allowed for battery racks. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 47 Set related parameters by referring to "Setting Parameters for Connecting to the Management System" (content related to a Huawei NMS) in the SmartLogger3000 User Manual . Figure 6-7 Management system Step 7 Click Skip for third-party NMS access. Connecting to a third-party NMS is not recommended.
  • Page 48 Stop Bit parameters of the relay protection device. Address Device Type Set this parameter to Relay protection device. Device model Set this parameter to Easergy P3U30. Setting microgrid parameters Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 49 – If Microgrid scenario is set to On-grid/Off-grid (PQ/VSG) or On-grid/Off-grid (VSG), Scenario under Arrays Operation Scenario shall be set to On/Off-grid. – If Microgrid scenario is set to On-grid/Off-grid (PQ/VSG), refer to the following parameter description. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 50 Manual: You need to manually turn on or off the on/off-grid switch at the grid connection point. – If Microgrid scenario is set to On-grid/Off-grid (VSG), refer to the following parameter description. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 51 Step 10 Click Finish. NO TICE Do not click Batch configurations shown in the following figure to send the array startup/shutdown command, because this will affect the wire sequence detection. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 52 ESSs is greater than 60°, rectify the cable connection. Wire sequence Check the time when the wire sequence detection is detection time complete. Wire sequence Check the wire sequence detection progress. check progress Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 53: On/Off-Grid (Vsg) Protection Parameter Settings

    ● For details about how to configure protection parameters for the relay protection device, see the manual of the relay protection device. ● To set ESS protection parameters, choose Monitoring > ESS > Running Param. > Protection Parameters. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 54 Level-1 UF 10000 protection time (ms) Frequency change rate (Hz/s) Minimum 0.14 delay (s) Note a: Rated voltage of the power grid. Note b: Rated frequency of the power grid. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 55: Switch Inspection

    Status is consistent with the actual on/off-grid switch status. If no, change the setting of DI port status to ensure that the status is consistent. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 56 Check whether the values of UAB of Grid, UBC of Grid, and UAC of Grid are consistent with the rated voltages of the local power grid. If they are Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 57 DO cable connection to Switch-on control port is normal. Step 6 After the load switch inspection is complete, choose Settings > Microgrid Control > Black Start and click Starting. ----End Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 58: System Commissioning (App)

    LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual 7 System Commissioning (App) System Commissioning (App) For details about how to commission the system (app), see FusionSolar App Quick Guide (SmartLogger). Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 59: Microgrid Control

    Switch-on control Set the DO port for turning on the on/off-grid switch port under On/Off- based on the actual cable connections. grid switch Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 60 To ensure reliable operations of the microgrid, the recommended value range is [10, 15] and this parameter must be ≥ (Array end-of-discharge SOC + 5%). Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 61 When this function is enabled, if the current ESS power backup SOC is ≤ (Min. SOC for off-grid power backup – 3%), the ESS will be charged preferentially by the PV system or the grid. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 62 ● Disable: The automatic microgrid adaptability control function is disabled. The microgrid adaptability of the inverter is not automatically set during on/off-grid switching. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 63 ● When the on/off-grid switch is on, the Close button is grayed out, and the Open button is available. ● When the on/off-grid switch is in invalid state, the Close and Open buttons are grayed out. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 64 5. The SmartLogger sends a command to set Microgrid compatibility to Disable under Monitoring > Inverter > Running Param. > Feature Parameters. 6. The SmartLogger sends a command to start the inverter and ESS. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 65: On-Grid/Off-Grid (Vsg)

    7. The SmartLogger sends a command to start the inverter. ----End 8.2 On-grid/Off-grid (VSG) Step 1 Set MGCC Mode to Enable. This parameter can be modified only under Deployment Wizard > Microgrid > Microgrid. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 66 To ensure reliable operations of the microgrid, the recommended value range is [85, 95] and this parameter must be ≥ (Array end-of-charge SOC – 5%). Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 67 When the SOC is less than or equal to Min. SOC for off-grid power backup, the ESS stops discharging to maintain sufficient power for off-grid operation. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 68 On-grid to Switch to Off-grid under After the planned switching Off-grid Planned switching control control is started, the on/off- grid switch is turned off and the system enters off-grid state. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 69 When the mains voltage is stable, synchronization will be performed. After the synchronization is successful, the on/off-grid switch is turned on and the system enters on- grid state. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 70 Close button is grayed out, and the Open button is available. ● When the on/off-grid switch is in invalid state, the Close and Open buttons are grayed out. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 71 If no, the switching failed, an alarm is reported, and on- grid operation continues. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 72 4. The SmartLogger checks whether the on/off-grid switch is turned on successfully. If yes, the switching from off-grid to on-grid is successful. If no, a switching failure alarm is reported. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 73 [2%, 5%] for a long time, the MGCC will fail to adjust the PCS voltage, and the reactive power of the PCS will occupy the active power of the Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 74: Off-Grid

    Step 2 Set Microgrid scenario to Off-grid. This parameter can be modified only under Deployment Wizard > Microgrid > Microgrid. Step 3 Choose Settings > Microgrid Control > General Configuration and set general configuration parameters. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 75 SmartLogger automatically attempts to black start to restore the power supply. ● Disable: When the PCS shuts down abnormally, the SmartLogger does not perform automatic black start. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 76 PV voltage increases. If the PV1 voltage of an inverter is greater than or equal to Min PV voltage for black start, the black start function may be enabled. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 77 Array end-of-charge SOC > End-of-charge SOC (off-grid) ≥ SOC threshold for stopping load shedding > SOC threshold for starting load shedding > End-of-discharge SOC (off- grid) > Array end-of-discharge SOC Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 78 6. If the SOC is less than the Array end-of- discharge SOC, the PV+ESS system shuts down and remote black start cannot be performed. In this case, technical engineers are required to handle the problem onsite. ----End Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 79: System Operations

    In the On-grid/Off-grid (PQ/VSG) scenario, choose Monitoring > ESS > Running Param. > Feature Parameters and set Working mode to PQ. Choose Monitoring > Inverter > Running Param. > Feature Parameters and set Microgrid compatibility to Disable. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 80 ESS cabinet doors are closed in a timely manner and that there is no condensation in the ESS (for example, there is no water drop in the ESS). Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 81 Choose Settings > Microgrid Control > Black Start to view the black start status and perform black start manually. Parameter Description Current Battery SOC View the current battery SOC. Black Start Progress View the black start progress. Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 82 ● Black start succeeded. Starting the ESS by Pressing the Local Black Start Button for the Off-Grid Operation (When the UPS Has No Power) Prerequisites: Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 83 ESS for more than 10s. NO TICE Press the black start button twice at an interval of at least 1 minute. Figure 9-1 Black start button Black start button Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 84: System Power-Off

    5 Device Power- in the reverse order. NO TE To prevent local operations on switches during subsequent power-on, you are advised not to turn off the auxiliary power switches. ----End Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 85: A Off-Grid Ups Capacity Configuration

    Note a: Battery capacity = (15 W + 15 W x ESS quantity) x 48 x 2/1000 Note b: 12 V battery ampere-hour = Battery capacity x 1000/12 Note c: 24 V battery ampere-hour = Battery capacity x 1000/24 Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 86: Reference Documents

    Microgrid Energy Storage Solution User Manual B Reference Documents Reference Documents Device Document ● LUNA2000-(107-215) Series Smart String ESS User Manual ● LUNA2000-(107-215) Series Smart String ESS Quick Guide Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 87 SmartLogger3000 User Manual ● SmartLogger3000 Quick Guide Power meter ● DTSU666-HW Smart Power Sensor Quick Guide ● YDS60-80 Smart Power Sensor Quick Guide FusionSolar app FusionSolar App User Manual Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 88 LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual B Reference Documents Device Document SmartPVMS ● SmartPVMS FusionSolar SmartPVMS User Manual (Owner) ● SmartPVMS FusionSolar SmartPVMS User Manual (Installer) Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 89: C Digital Power Customer Service

    LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual C Digital Power Customer Service Digital Power Customer Service https://digitalpower.huawei.com/robotchat/ Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 90: Contact Information

    To ensure faster and better services, we kindly request your assistance in providing the following information: ● Model ● Serial number (SN) ● Software version ● Alarm ID or name ● Brief description of the fault symptom Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 91 Microgrid Energy Storage Solution User Manual D Contact Information NO TE EU Representative Information: Huawei Technologies Hungary Kft. Add.: HU-1133 Budapest, Váci út 116-118., 1. Building, 6. floor. Email: hungary.reception@huawei.com Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 92: Acronyms And Abbreviations

    User Manual E Acronyms and Abbreviations Acronyms and Abbreviations Automatic Transfer Switch Central Monitoring Unit Energy Storage System Fast Ethernet Power Control System Small Form-factor Pluggable State of Charge Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.
  • Page 93 LUNA2000-215-2S10 Commercial and Industrial Microgrid Energy Storage Solution User Manual E Acronyms and Abbreviations State of Health Uninterruptible Power Supply Issue 02 (2025-02-08) Copyright © Huawei Digital Power Technologies Co., Ltd.

Table of Contents