LUNA2000-(215-2S10, 215-2S12) Smart String ESS
User Manual
5.2 Clearance Requirements
The following figures show the minimum clearance requirements for installation
and O&M. The equipment clearances must also meet the site selection
requirements (see
Figure 5-1 Clearance requirement 1
Figure 5-2 Clearance requirement 2
Issue 01 (2024-07-31)
NO TICE
5.1 Site Selection
Copyright © Huawei Digital Power Technologies Co., Ltd.
Requirements).
5 Site Requirements