Download Print this page
Huawei LUNA2000-215 Series Quick Manual
Huawei LUNA2000-215 Series Quick Manual

Huawei LUNA2000-215 Series Quick Manual

Smart string ess
Hide thumbs Also See for LUNA2000-215 Series:

Advertisement

Quick Links

Issue: 03
Part Number: 31500JMF
LUNA2000-(215-2S10, 215-2S12)
Smart String ESS
Quick Guide
Scan for support
Copyright © Huawei Digital Power Technologies Co., Ltd. 2024. All rights reserved.

Advertisement

loading
Need help?

Need help?

Do you have a question about the LUNA2000-215 Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Huawei LUNA2000-215 Series

  • Page 1 Issue: 03 Part Number: 31500JMF LUNA2000-(215-2S10, 215-2S12) Smart String ESS Quick Guide Scan for support Copyright © Huawei Digital Power Technologies Co., Ltd. 2024. All rights reserved.
  • Page 2 Before installing the equipment, read the user manual carefully to get familiar with product information and safety precautions. The product warranty does not cover equipment damage caused by failure to follow the storage, transportation, installation, and usage guidelines specified in this document and the user manual.
  • Page 3 Product Appearance 产品外观 ≤ 15 kg...
  • Page 4 Installation and Maintenance Clearances 安装维护空间...
  • Page 6 Installing the ESS 安装储能系统 Properly keep the top cover of the outer packaging, as it will be used to facilitate locating the ESS. 外包装顶盖将用于辅助定位储能柜位置,请妥善保存。...
  • Page 7 Forklift: load-bearing capacity ≥ 3 t Crane: hoisting capacity ≥ 3 t; operating radius ≥ 2 m 吊车起吊能力 ≥3t ;工作半径 ≥2m 。 叉车承重能力 ≥3t 。...
  • Page 8 If the ESS is not positioned stably, use a spacer to level the ESS before securing it. 储能系统不平稳时,在固定前,可使用调平垫片进行调平。...
  • Page 10 Installing Ground Cables 安装保护地线 Single-core outdoor copper/copper-clad aluminum/aluminum alloy cable (prepared by the customer) 单芯户外铜芯 / 铜包铝 / 铝合金线缆(用户自备) Customer's ground grid 客户侧接地网...
  • Page 11 Hot-dip zinc-coated flat steel sheet (prepared by the customer) 热镀锌扁钢(用户自备) Customer's ground grid 客户侧接地网...
  • Page 12: Installing Cables

    Installing Cables 安装线缆 The cable size must comply with local cable standards. The factors that affect cable selection include the rated current, cable type, routing mode, ambient temperature, and maximum expected line loss. 线缆线径的选取应符合当地线缆标准。影响线缆选取的因素有:额定电流、电缆类型、敷设方式、环境温度和最大期望线路损耗。 PCS AC power cable to the mains (prepared by the customer) PCS 市电交流线(用户自备)...
  • Page 13 UPS AC input power cable (prepared by the customer) UPS 交流输入线(用户自备) Four-core or eight-core single-mode armored cable with a transmission wavelength of 1310 nm (prepared by the customer) 支持传输波长为 1310nm 的 4 芯或 8 芯单模铠装光缆(用户自备)...
  • Page 14 Installing PCS Power Cables 安装PCS电源线 Power distribution cabinet 配电柜...
  • Page 16 Installing AC Input Power Cables for the Auxiliary Power Supply 安装辅助供电交流输入线 Power distribution cabinet 配电柜...
  • Page 17 When the PCS is used to provide the auxiliary power supply, the power supply to the PCS will be disconnected at the same time if the mains power is off. 当采用 PCS 为辅助电源供电时,一旦市电断开, PCS 会同时 失去电源供应。...
  • Page 18 Installing UPS Cables (Off-Grid Scenario) 安装UPS线缆(离网场景)...
  • Page 19 (Optional) Installing the SmartLogger (可选)安装SmartLogger...
  • Page 20 Installing FE Communications Cables 安装FE通信线 White-and-orange 白橙 橙 Orange 白绿 White-and-green 蓝 Blue 白蓝 White-and-blue 绿 Green 白棕 White-and-brown 棕 Brown...
  • Page 21 Installing Optical Fiber Communications Cables 安装光纤通信线...
  • Page 22 Installing Battery Pack Cables 安装电池包线缆...
  • Page 23 Follow-up Procedure 接线后处理 Sealing putty 密封泥...
  • Page 25: Check Before Power-On

    Check Before Power-On 上电前检查 Check Item Acceptance Criteria  The equipment is intact and free from rust and paint flake-off. If the paint flakes off, repair the damaged paint. Equipment exterior  The labels on the equipment are clear. Damaged labels must be replaced. ...
  • Page 26 检查项 验收标准  设备外观完好,无损坏,无锈蚀和掉漆。如有掉漆,请进行补漆操作。 设备外观  设备标签清晰可见,损坏的标签要及时更换。  线缆防护层包裹完好无明显损坏。 线缆外观  穿管线缆软管完好  线缆连接位置与设计相同。  端子制作符合规范,连接牢固可靠。 线缆连接  各线缆两端标签清晰明确,标签朝向一致  走线满足强弱电分离原则。  线缆整齐、美观。  线缆布线 线扣接头剪齐,无尖刺外露等现象。  在转弯处按要求留出余量,不得拉紧。  走线平直、顺滑,机柜内线缆无交叉。  开关 簇控制盒隔离开关处于 OFF 状态。(可选,有簇控制盒隔离开关时执行该操作)...
  • Page 27 Power-On 上电操作 1. Wear insulated gloves and use insulated tools to prevent electric shock or short circuits. 2. During the power-on procedure, monitor the system for faults. If you detect any faults, power off the ESS, rectify the faults, and then continue with the procedure.
  • Page 28 Check that the AC voltage is within the normal range using a multimeter. 用万用表交流电压档测量,需符合正常电压范围。...
  • Page 29 Path: About Us > Contact Us > Service Hotlines 具体路径为:“关于我们 > 联系我们 > 服务热线” https://digitalpower.huawei.com/robotchat/...
  • Page 30 Huawei Digital Power Technologies Co., Ltd. Huawei Digital Power Antuoshan Headquarters Futian, Shenzhen 518043 People's Republic of China digitalpower.huawei.com...

This manual is also suitable for:

Luna2000-215-2s10Luna2000-215-2s12