Confirming Warm-Up Completion - Omron ZX-E Operation Manual

Zx-e smart sensors series inductive displacement type
Hide thumbs Also See for ZX-E:
Table of Contents

Advertisement

Confirming Warm-up Completion

When the power is turned ON in RUN or T Mode, the sub-display will flash W-UP to show that
the Sensor is warming up. Warm-up requires approximately 5 to 15 minutes. When warming
up has been completed, the normal display will be shown.
SUB
Measurement operations can be performed while in warm-up display status, but the precision of
measurements before warming up has been completed will be low. For high-precision measure-
ments, wait until warming up has been completed.
PREPARATIONS FOR MEASUREMENT
Section 2
ZX-E
41
Operation Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zx-edr5tZx-ed01tZx-ed02tZx-em02tZx-em07mtZx-em02ht

Table of Contents