Download Print this page

Installing The Enclosure Into The Rack - Viking VSS2249RQ User Manual

Advertisement

3. Once the screws are fully inserted, release the catch to secure the rail to
4. Align the left front bracket mounting screws with the appropriate rack
5. Push and hold the release catch outward (see Figure 4.17) and insert
Figure 4.17 Install the front bracket
6. Once the mounting screws are fully inserted into the rack post holes,
7. Repeat steps 1 through 6 to install the right rear and front cabinet

INSTALLING THE ENCLOSURE INTO THE RACK

Once the rail kit is installed, install the enclosure into the rack as outlined in the
following steps.
CTC-DOC-002293, Rev A.2
the post. Refer to the "After" image in Figure 4.16 on page 40 for an
illustration of a properly installed left rear cabinet member bracket.
post holes in the front left rack post. Ensure the rail is level before
continuing.
the left front bracket mounting screws into the left front rack post holes.
Verify the rail is level.
Before
Release
catch
release the catch to secure the rail to the post. Refer to the "After" image
in Figure 4.17 for an illustration of a properly installed left front cabinet
member bracket.
member rail into the right rear and front rack post.
CAUTION: Avoid personal injury and obtain assistance or use a lift table or forklift when
installing the system into the rack.
CAUTION: Extreme care must be taken when inserting the enclosure to hold it both
horizontally and square to the rails. This will require two people.
VSS2249RQ Storage Server User Guide
After
| 41 |

Advertisement

loading

This manual is also suitable for:

Bsp-28