IBM 3745 Problem Determination Manual page 350

Communication controller
Table of Contents

Advertisement

o
o
o
o
o
12
WRAP TEST SUCCESSFUL is displayed on next screen
D.
• The test is successful if:
All transmitted wraps have been correctly received.
- NBR OF WRAPS TRANSMITTED: 010
- NBR OF WRAPS RECEIVED: 010
- NBR OF WRAPS INCORRECT: 000
• Actions:
Wrap Test
1. If you have not run both data and lead options (as shown on step 6):
-
~
and
r~-run
'this step using the option you have not yet tried.
- Go back to step 5.
2. If you are wrapping a LlC3, reverse the wrap cable then:
-
~
and re-run both data and lead options.
- Go back to step 5.
3. If you have ru n both data and control lead options then:
-
~
to end the function.
- Return to the problem determination procedure you come from
(Chapter 9 or 10) to perform the specific action.
If you started wrap tests without performing any other tests, for a better
problem determination, we advise you to go to:
.• Chapter 9, "LlC and Line Problems (LSS)" on page 9-1.
• Chapter 10, "Line Problem (HSS)" on page 10-1.
• Remove the wrap plug and reconnect the L1C cable(s), first at the 3745 end,
then at the wall socket
.Screen
D
--------------------------------------------------------------------------------- m m/dd/yy . h h : m m
FUNCTION ON SCREEN: WRAP TEST
WRAP TEST RESULTS
LINE ADDRESS: 0
LCD 9: SDLC
TYPE: CNTRL
LEVEL: MODEM
CNTRL PGM: NCP
L1C TYPE: 3
NBR OF WRAPS
NBR OF WRAPS
NBR OF WRAPS
TRANSMITTED:
IiD' i J
RECEIVED:
IiD' i J
INCORRECT:
1m
= =
=
>
WRAP TEST SUCCESSFUL
F1:END F2:MENU2 F3:ALARM F4:TEST INITIALIZATION
Chapter 16. Wrap Test
16-7