IBM 3745 Problem Determination Manual page 285

Communication controller
Table of Contents

Advertisement

Problems on Both Lines of a
Lies
6
Enter the address of one of the lines of the suspected LlC. (
I
SEND]
The next
screen is displayed.
The following message is then displayed on Ifne
II.
WRAP TEST STARTED, PLEASE WAIT 30 SECONDS
--------------------------------------------------------------------------------- m
m/dd/yy h h:
m m
FUNCTION ON SCREEN: WRAP TEST
AUTOMATIC WRAP TEST ON L1C
LINE RANGE ADDRESS: 0004 - 0007 LlC TYPE: 1
= = =
>
WRAP TEST STARTED, PLEASE WAIT 30 SECONDS
a
F1:END F2:MENU2 F3:ALARM F4:WRAP TEST INITIAL SELECTION
7
Wait
~proximately
30 seconds. One of the following messages is displayed on
line
1.i1,
WRAP TEST COMPLETED: THE LlC IS FAUL TV
Action:
§J
Go to step 8.
WRAP TEST COM PLETED: THE
Lie
IS OK
Action:
• Check the control program generation parameters. with the LID Function (both
lines). See the 3745 Advanced Operations Guide.
• Check {and correct if necessary) the LlCS configuration. See the 3745
Connection and Integration Guide.
Note: Other wrap test messages are documented in the 3745 Advanced Operations Guide.
9-34
IBM 3745 Communication Controller: Problem Determination Guide
o

Advertisement

Table of Contents
loading

Table of Contents