Bts Quadra; Bts (Philips) Spirit; Verifying The Connections To A Bts Telecine - evertz 4025 Instruction Manual

Film footage encoder
Table of Contents

Advertisement

Model 4025 Film Footage Encoder Manual
2 connector should be connected to pin 6 of the 4025 Parallel I/O
connector.
The telecine type item on the Engineering Toolbox Hardware Menu must
be set to BTS QUADRA/FDL. (See section 3.6.4)

2.11.5. BTS QUADRA

The bi-phase tach pulse is available on the 9 pin D Sepmag connector on
the telecine. Connect pins 1 and 5 from this connector to pins 3 and 7 of
the 9 pin parallel I/O connector of the 4025 respectively. Connect ground
(pin 7 on the telecine connector to pin 6 on the 4025 connector. Note that
the pulse output should be set to 10 pulses per film frame by proper
selection of the jumper on the sprocket Pulse card in the telecine (FY806 or
FM735 card).
The FRID pulse is available on pin 17 of the External 2 25 pin D connector
on the telecine. This pulse should be connected to pin 2 pf the Parallel I/O
connector of the 4025. Ground for the FRID pulse on pin 18 of the External
2 connector should be connected to pin 6 of the 4025 Parallel I/O
connector.
Connect the PRESTOP signal (Pin 3 on the WETGATE connector of the
Quadra) to PIN 4 of the 4025 PARALLEL connector. You will also need to
remove the cover of the 4025 and set Jumper J37 on the 7006 I/O board to
the 4IN position.
The telecine type item on the Engineering Toolbox Hardware Menu must
be set to BTS QUADRA/FDL. (See section 3.6.4)

2.11.6. BTS (Philips) Spirit

The signals required to connect the Spirit telecine are found on the 9 pin D
TC GEN OUT connector (J23) on the Spirit. Connect the bi-phase tach
pulse outputs (pins 1 and 5) from this connector to pins 3 and 7 of the 9 pin
parallel I/O connector of the 4025 respectively. Connect ground (pin 7 on
the telecine connector) to pin 6 on the 4025 connector. Note that the pulse
output should be set to 10 pulses per film frame. Connect the Start of
Frame (SOF) pulse (pin 2) to pin 2 of the Parallel I/O connector of the
4025.
The telecine type item on the Engineering Toolbox Hardware Menu must
be set to BTS SPIRIT. (See section 3.6.4)

2.11.7. Verifying the Connections to a BTS Telecine

When you have completed the basic telecine connections, you will need to
verify the frame accuracy of the basic system. Once you have verified the
basic connections, you may proceed to the KeyKode reader installation.
INSTALLATION
Page 2-23

Advertisement

Table of Contents
loading

Table of Contents