S/5 Avance Planned Maintenance - Datex-Ohmeda S/5 Avance Technical Reference Manual

Anesthesia machine
Table of Contents

Advertisement

S/5 Avance

6.1 S/5 Avance Planned Maintenance

Serial Number:
Hospital:
12 months
6.1.1 Every twelve (12)
Parts Replacement
Checks and Tests
6-2
24 month
48 month
Perform the following steps every 12 months.
For details, refer to the sections listed.
months
• Sections marked URM are found in the User's Reference manuals for the
Avance anesthesia system.
• Sections marked TRM are found in this Technical Reference manual.
Replace the vaporizer port o-rings (TRM - Section 9.12.1)
(Kit Stock Number 1102-3016-000)
1. AGSS Maintenance (URM - Part 2, Section 2):
• Empty any condensate from the reservoir (disposable item).
• Inspect air brake for occlusion on active AGSS.
• Inspect, clean or replace filter on active AGSS.
2. Breathing System Maintenance (URM - Part 2, Section 2)
3. Bellows Assembly Maintenance (URM - Part 2, Section 2)
4. Bellows Assembly Tests (URM - Part 2, Section 2)
5. O
Cell Calibration (URM - Part 2, Section 3)
2
6. Flow Sensors Calibration (URM - Part 1, Section 5)
7. Perform the checkout procedures in Section 3.
• Inspect the system (TRM - Section 3.1)
• Backlight test (TRM - Section 3.3)
• Vaporizer back pressure test (TRM - Section 3.4)
• Pipeline and cylinder tests (TRM - Section 3.5)
• O
supply alarm test (TRM - Section 3.5.1)
2
• Pressure relief tests (TRM - Section 3.6)
• Flush Flow Test (TRM - Section 3.7)
• Alarm tests (TRM - Section 3.8)
• Power failure test (TRM - Section 3.12)
8. Alternate O
9. Auxiliary O
10.Integrated Suction Regulator tests (TRM - Section 6.8)
11. Mixer outlet check valve leak test (TRM - Section 6.5.1)
Date: (YY/MM/DD)
Performed by:
______________________
flowmeter tests (TRM - Section 6.6)
2
flowmeter tests (TRM - Section 6.7)
2
/
/
11/03 1009-0357-000

Advertisement

Table of Contents
loading

Table of Contents