Datex-Ohmeda S/5 Avance Technical Reference Manual page 153

Anesthesia machine
Table of Contents

Advertisement

1009-0357-000 11/03
Test 15
Testing a flow sensor including the Ventilator Monitoring Assembly
and interfacing components
1. Remove Flow Sensors from the Flow Sensor Module.
2. Attach the Flow Sensor to the bulkhead connector.
3. Plug each Flow Sensor as shown.
4. Connect the low-pressure leak test device to the open end of the Flow
Sensor.
5. Compress and release the bulb until it is empty.
6. If the bulb inflates in 30 seconds or less, there is a leak. The leak may be
through the connector o-rings, in the internal tubbing, or in the Transducer
on the VIB.
7 Troubleshooting
7-25

Advertisement

Table of Contents
loading

Table of Contents