20. Connect each power cord to the server.
21. Connect each power cord to the power source.
22. Power up the server on page 23.
The installation is complete.

Installing the optical drive option

Procedure
1.
Power down the server on page 23.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Server in rack mode: Remove the server from the rack on page 23.
Server in tower mode: Position the tower server for hardware configuration on page 25.
5.
Remove the access panel on page 25.
6.
Remove the PCI air baffle on page 29.
7.
Remove the system air baffle on page 30.
8.
Remove the optical drive cover.
9.
Remove the EMI shield from the front panel.
Hardware options installation