Figure 158: Lifting The Locking Handle And Removing The Power Supply - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

Chapter 12: Replacing Modules
250
Figure 158. Lifting the Locking Handle and Removing the Power Supply
12. Do one of the following:
To install a new power supply, refer to Chapter 6, "Installing the
Power Supplies" on page 109.
If you are not installing a new power supply, continue with this
procedure to install a blank slot cover.
13. Place the locking handle on the slot cover in the up position and slide
the cover into the empty power supply slot. Refer to Figure 159 on
page 251.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents