Figure 56: Locking The Handle On The At-Sbxpwrpoe1 Power Supply - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

SwitchBlade x8112 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
6. Lower the locking handle of the power supply module to secure the
module in the slot, as shown in Figure 56.
Figure 56. Locking the Handle on the AT-SBxPWRPOE1 Power Supply
Note
If the module does not fully seat in the chassis slot, check to be sure
you are installing a PoE power supply and not a system power
supply. The model name of the module is included on a label on the
locking handle. For more information, refer to "Power Supplies and
Power Supply Slots" on page 24.
7. To install a second AT-SBxPWRPOE1 Power Supply, repeat this
procedure.
8. After installing the AT-SBxPWRPOE1 Power Supplies, go to Chapter
7, "Installing the AT-SBx81CF400 Control Card and Ethernet Line
Cards" on page 129.
Note
Retain the tie wrap that comes with the power supply. You use it to
secure the power cord to the chassis when you power on the unit in
"Powering On AT-SBxPWRPOE1 Power Supplies" on page 179.
121

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents