Figure 157: Reinstalling The Nut And Washer On The Grounding Post - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

SwitchBlade x8112 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
Figure 157. Reinstalling the Nut and Washer on the Grounding Post
11. Lift the locking handle and slide the power supply from the chassis.
Refer to Figure 158 on page 250.
Warning
The power supply is heavy. Use both hands to hold the module as
you remove it from the chassis.
249

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents