Chapter 10: Verifying The Hardware Operations Of The Chassis - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

Chapter 10
Verifying the Hardware Operations of
the Chassis
This chapter describes how to verify the operations of the chassis. The
chapter contains the following sections:
"Using the LEDs to Verify the Chassis" on page 212
"Using Local Management to Verify the Chassis" on page 214
Note
Allied Telesis recommends using both methods to confirm the initial
operations of the chassis, controller cards, and line cards.
211

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents