Preparing The Equipment Rack - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

Preparing the Equipment Rack

SwitchBlade x8112 Chassis Switch and AT-SBx81CFC400 Card Installation Guide
This section explains how to prepare the equipment rack for the chassis.
The procedure requires the following items:
#2 Phillips-head screwdriver (not provided)
Two equipment rack screws (not provided)
To prepare the equipment rack for the AT-SBx8112 Chassis, perform the
following procedure:
Caution
The chassis is heavy and should be mounted as low as possible in
the equipment rack to maximize vertical stability.
1. Reserve 311.1 mm (12.25") of vertical rack space for the installation of
the AT-SBx8112 Chassis, as shown in Figure 32 on page 96.
2. Do not mount any other equipment within 152.4 mm (6") above this
space during installation. This additional vertical space is temporary
and allows you enough room to lift and tilt the chassis into its position
in the equipment rack without hitting other equipment, as shown in
Figure 38 on page 103. You may use this additional space for other
network equipment after the chassis is installed.
95

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents