Figure 139: Connecting The Negative Lead Wire With Bare Wire - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

Chapter 9: Powering On the Chassis
206
Figure 139. Connecting the Negative Lead Wire with Bare Wire
Allied Telesis recommends tightening the screw to 30 to 40 inch-lbs.
Warning
Check to see if there are any exposed copper strands coming from
the installed wires. When this installation is done correctly there
should be no exposed copper wire strands extending from the
terminal block. Any exposed wiring can conduct harmful levels of
electricity to persons touching the wires.  E12
6. Slide the plastic cover to the left and lightly tighten the two screws with
a #1 Phillips-head screwdriver to secure the cover. See Figure 128 on
page 196. You might need to lift the locking handle slightly to access
the bottom screw.
Caution
Do not over tighten the screws or you may crack or break the plastic
cover.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents