Installing The At-Sbx8112 Chassis In The Equipment Rack - Allied Telesis AT-SBx81CFC400 Installation Manual

Layer 3+ chassis switch
Table of Contents

Advertisement

Chapter 5: Installing the Chassis in an Equipment Rack

Installing the AT-SBx8112 Chassis in the Equipment Rack

102
The procedure in this section explains how to install the chassis in the
equipment rack. The procedure requires the following items:
#2 Phillips-head screwdriver (not provided)
Six equipment rack screws (not provided)
#2 Phillips-head, 10 inch-lbs torque screwdriver (optional — not
provided)
Caution
Do not remove the shipping brace from the front of the AT-SBx8112
Chassis until after the unit is securely mounted in the rack. The plate
prevents twisting of the chassis frame and mechanical misalignment
of the line card slots during shipping and installation.
Warning
The chassis may be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.  E30
Warning
To prevent injuring yourself or damaging the device, do not attempt
to install the chassis in the equipment rack alone. Allied Telesis
recommends a minimum of three people for this procedure.
Before installing the chassis in the rack, review the following checklist:
Did you reserve sufficient space in the equipment rack for the
chassis and install two screws in the rack on which to rest the
chassis while securing it to the rack? If not, then perform
"Preparing the Equipment Rack" on page 95.
Did you adjust the brackets so that the front of the chassis will be
positioned correctly in the equipment rack for your installation? If
not, then perform "Adjusting the Equipment Rack Brackets" on
page 100.
To install the AT-SBx8112 Chassis in the equipment rack, perform the
following procedure:
1. While facing the front of the chassis, tilt the top of the chassis toward
you, as shown in Figure 38 on page 103.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade x8112

Table of Contents