Chapter 4
Timing Requirements
ARM DDI 0275D
The timing requirements for the ETB11 interfaces are defined in this chapter. It contains
the following sections:
•
AHB interface on page 4-2
•
CLK domain on page 4-4
•
IEEE1149.1 interface on page 4-6.
Copyright © 2002, 2003 ARM Limited. All rights reserved.
4-1