Installing The Gpu Option - HPE ProLiant ML110 User Manual

Table of Contents

Advertisement

11. Close the PCIe slot cover retainer.
12. Install the system air baffle on page 31.
13. Install the PCI air baffle on page 30.
14. Install the access panel on page 26.
15. Do one of the following:
Server in rack mode: Install the server into the rack on page 53.
Server in tower mode: Return the server to an upright position.
16. Connect all peripheral cables to the server.
17. Connect each power cord to the server.
18. Connect each power cord to the power source.
19. Power up the server on page 23.
The installation is complete.

Installing the GPU option

The server PCIe3 slots 1 and 4 support GPUs.
In general, 75W GPUs draw power from PCIe slots. GPUs that have a power requirement higher than 75W
require an external auxiliary power cable connection. For specific information about power requirements of a
GPU, see the GPU user documentation.
For a list of specific GPU models supported, see the product QuickSpecs on the server product page at
http://www.hpe.com/servers/ml110-gen10.
Prerequisites
Before installing this option, make sure that you have the following items available:
GPU option kit
T-15 Torx screwdriver
Hardware options installation
79

Advertisement

Table of Contents
loading

Table of Contents