10. Connect the Mini-SAS cable or the SATA and the SATA management port cables.
11. Connect rear 2-bay SFF power cable.
12. Install the drives.
13. Install the air baffle.
14. Install the access panel.
15. Install the server into the rack.
16. Connect all peripheral cables to the server.
17. Connect each power cord to the server.
18. Connect each power cord to the power source.
19. Power up the server.
The installation is complete.

Installing the 8 to 12 upgrade option in the LFF chassis

The 8 LFF chassis can be upgraded to 12 LFF chassis with this option installed.
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
T-10 Torx screwdriver
Flat-headed screwdriver
Procedure
1.
If installed, remove the front bezel.
2.
Power down the server.
3.
Remove all power:
Hardware options installation