18. Connect each power cord to the power source.
19. Power up the server.
The installation is complete.
Installing the GPU option
Prerequisites
•
Before installing this option, make sure that you have the following items available:
◦
GPU option kit
◦
T-15 Torx screwdriver
◦
GPU holder for full-length GPU (PN P11529-B21)
•
If you are installing the GPU with a power requirement higher than 75W, make sure that one of the following is
installed:
◦
ATX 500W non-hot-plug power supply
Flexible slot power supply
◦
Update the server firmware if it is not the latest revision.
•
Procedure
1.
Back up all server data.
2.
Power down the server.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
•
Server in rack mode: Remove the server from the rack.
Server in tower mode: Position the tower server for hardware configuration.
•
6.
Remove the access panel.
7.
Remove the PCI air baffle.
8.
Remove the system air baffle.
9.
Remove the PCI slot blank:
a. Open the PCI slot retainer.
Hardware options installation
84