Installing an LFF non-hot-plug drive

Prerequisites
Before you perform this procedure, make sure that you have a T-15 Torx screwdriver available.
Procedure
1.
Power down the server on page 23.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
Server in rack mode: Remove the server from the rack on page 23.
Server in tower mode: Position the tower server for hardware configuration on page 25.
5.
Remove the access panel on page 25.
6.
Remove the front bezel on page 27.
7.
Remove the PCI air baffle on page 29.
8.
Remove the system air baffle on page 30.
9.
Disconnected all existing drive cage cables.
10. Remove the installed drive cage.
11. Use the screws on the non-hot-plug drive cage to install the drives.