21. Connect each power cord to the power source.
22. Power up the server on page 23.
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard
Enterprise website.
Installing an LFF hot-plug drive
CAUTION: To prevent improper cooling and thermal damage, do not operate the rack unless all device
bays are populated with either a component or a blank.
Prerequisites
Before you perform this procedure:
•
Verify that the LFF hot-plug drive cage is installed.
•
Make sure that you have the LFF hot-plug drive option is available.
Procedure
1. Open the front bezel.
2. Remove the drive blank.
3. Prepare the drive.
4. Install the drive.
46
Hardware options installation