d. If you are installing a second SSD, repeat steps a–c.
8.
For 2U server blade, do the following:
a. Install the air baffle.
b. Install the top cover.
9.
Install the server blade in the chassis.
10. Power up the server blade.
GPU power enablement option
This option is available for the 2U server blade.
Installing the GPU power enablement option
The server blade supports PCI card, PCIe card and GPU. If these expansion cards have additional power requirement, the GPU
power enablement option is installed.
Procedure
1.
Power down the server blade.
2.
Remove the server blade from the chassis.
3.
Remove the top cover.
4.
Disassemble the top cover.
32
Hardware options installation