Install The Access Panel - HPE ProLiant ML110 User Manual

Table of Contents

Advertisement

CAUTION: To prevent damage to electrical components, properly ground the server before beginning
any installation procedure. Improper grounding can cause electrostatic discharge.
Procedure
1. Power down the server on page 23.
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Disconnect all peripherals cables from the server.
4. If a Kensington security cable is installed, disconnect it from the rear panel. See the security cable
documentation for instructions.
5. Do one of the following:
Server in rack mode: Remove the server from the rack on page 23.
Server in tower mode: Position the tower server for hardware configuration on page 25.
6. Remove the access panel:
a. Loosen the access panel thumbscrews.
b. Slide and remove the access panel from the server.

Install the access panel

Procedure
1. Install the access panel:
26
Operations

Advertisement

Table of Contents
loading

Table of Contents