20. Do one of the following:
•
Server in rack mode: Install the server into the rack on page 53.
•
Server in tower mode: Return the server to an upright position.
21. Connect all peripheral cables to the server.
22. Connect each power cord to the power source.
23. Power up the server on page 23.
The installation is complete.
Drive cage options
The server supports the following drive cage options:
•
Four-bay LFF non-hot-plug drive cage
•
Four-bay LFF hot-plug drive cage
•
Eight-bay SFF hot-plug drive cage
If only one drive cage is installed, install it in box 1. Mixing LFF and SFF drive cages in the same server is not
supported.
Installing the four-bay LFF non-hot-plug drive cage
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
•
Four-bay LFF non-hot-plug drive cage option
•
LFF non-hot-plug drive option
•
T-15 Torx Screwdriver
Procedure
1.
Power down the server on page 23.
2.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3.
Disconnect all peripheral cables from the server.
4.
Do one of the following:
•
Server in rack mode: Remove the server from the rack on page 23.
•
Server in tower mode: Position the tower server for hardware configuration on page 25.
5.
Remove the access panel on page 25.
Hardware options installation
63