Chapter 5: Installing The Switch In An Equipment Rack - Allied Telesis 950 Series Installation Manual

Advanced layer 3+ stand-alone switches
Table of Contents

Advertisement

Chapter 5
Installing the Switch in an Equipment
Rack
This chapter contains instructions for installing the switch in a standard 19-
inch equipment rack. The procedures are listed here:
"Beginning the Installation" on page 86
"Removing the Bumper Feet" on page 88
"Installing the Switch" on page 89
85

Advertisement

Table of Contents
loading

This manual is also suitable for:

At-x950-28xsqAt-x950-28xtqm

Table of Contents